Welcome to the Knowledge Democracy / Participatory Research Community. This community serves as a comprehensive repository of resources on participatory approaches, community-based research, and collaborative inquiry methods. Our mission is to foster knowledge sharing and support initiatives that empower communities to contribute to research, ensuring their voices shape the knowledge that impacts their lives.

Explore a wealth of materials, including case studies, policy papers, training guides, and research publications that highlight the practice and principles of participatory research worldwide.

Browse

Search Results

Now showing 1 - 1 of 1
  • Thumbnail Image
    Item
    Programme Evaluation and Review Techniques (PERT) & Critical Path Method (CPM) August 20-25, 2001
    (Participatory Research in Asia (PRIA), 2001-08-20) Bandyopadhyay, K. K
    This paper by Dr. K.K Bandyopadhyay examines Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM) as project management techniques for planning, scheduling, and controlling projects and helps in determining project duration, identifying critical activities, and managing flexibility in scheduling. The paper traces the historical development of both techniques, noting that PERT was developed in the United States during the 1950s to plan and accelerate ballistic missile development, while CPM was developed independently and focuses on obtaining trade-offs between cost and completion date. It introduces key terminologies for an in-depth understanding of PERT and CPM through an example of the budgeting process of an organization called DEEP, demonstrating how projects are broken down into jobs with immediate predecessor relationships and time estimates. Activity-on-node (AON) diagrams are used to portray these relationships graphically. The paper also explains how PERT calculates the expected value of activity duration as a weighted average and provides a formula for it. Further, it examines the concept of the critical path, or the longest path of the network project, arguing that its length determines the duration of a project and must be shortened to reduce project completion time. It analyses concepts like job slack and presents an algorithm for finding the Critical path. The paper concludes by demonstrating an example of a watershed project to identify the critical path.